The landfill drainage Geocomposite drain sheet

The landfill drainage Geocomposite drain sheet

Short Description:

The structure of the plastic blind ditch consists of a silk strip of about 2mm, which is formed in a three-dimensional network, which is the same principle as the structure of the steel structure. The surface open hole is 95-97%, which is five times more than the orifice tube, is 3-4 times the resin grid tube, and the surface suction rate is extremely high. 2, because it is the three-dimensional structure, the gap rate is 80-95%, constitute a space with management and deft, the compressive pe...


  • FOB Price: US $0.5 - 9,999 / Piece
  • Min.Order Quantity: 100 Piece/Pieces
  • Supply Ability: 10000 Piece/Pieces per Month
  • Port: Shenzhen
  • Payment Terms: L/C,D/A,D/P,T/T
  • Product Detail

    Product Tags

    The structure of the plastic blind ditch consists of a silk strip of about 2mm, which is formed in a three-dimensional network, which is the same principle as the structure of the steel structure.
    The surface open hole is 95-97%, which is five times more than the orifice tube, is 3-4 times the resin grid tube, and the surface suction rate is extremely high.
    2, because it is the three-dimensional structure, the gap rate is 80-95%, constitute a space with management and deft, the compressive performance of more than 10 times stronger than tube structure of the resin, therefore, even crushed because of excess load, but because it is the three-dimensional structure, so the residual space also more than 50%, there is no water problem, without consideration of the soil pressure is bad.
    Pressure strength, 250KPa under pressure, the compression rate is under 10%.
    The addition of an anti-aging agent, durable, and under water, the middle of the earth will be in place for decades to ensure stability.
    The compressive and flexible, also can be constructed in the bend, etc., it is very portable, if the backfill depth is about 10cm, and the bulldozer can be refilled and so on.
    6, due to the above characteristics, therefore to various problems in the traditional blind ditch before, such as uneven settlement or parts caused by overload, being led to the suspension of gap caused no function problem, can be solved through blind ditch of plastic materials.
    Due to the use of thermal melting in the process of forming and not using the binder, it is not caused by ageing and stripping.

  • Previous:
  • Next:
  • Send your message to us:

    INQUIRY NOW
    • * CAPTCHA: Please select the House

    Related Products

    INQUIRY NOW
    • * CAPTCHA: Please select the Plane

    INQUIRY NOW
    • * CAPTCHA: Please select the Car